Introduction: Off to Niles
Day 0: Toronto to Niles
Day 1: Designing the Frame
Day 2: Lug Shaping and Mitering
Day 3: Brazing
Day 4: Starting on the Forks
Day 5: More fork work, etc.
Day 6: Lots of Brazing by Me... Disaster for Dan
Day 7: Rest
Day 8: Tacking and Brazing the Front Triangle
Day 9: Finishing the Front Triangle, Starting on Lug Filing
Day 10: Brazing the Chainstays
Day 11: Brazing the seatstays
Day 12: Brake and Chainstay Bridges
Day 13: Frame is finished
2 comments:
pays to link! I would have never found these posts. I plan on reading every one of them!
Thanks for posting all of this. It was one of the things that made me choose Doug's class over some of the alternatives (I take it early next year). Bike looks very nice.
Post a Comment